Professional Smart
Home Installation
KNX-certified engineers on site — from panel mounting and bus wiring through to full ETS6 programming, DALI commissioning and owner handover.
On-site scope
What we do on site
Panel installation
Safe mounting and mechanical integration of the delivered panel into the electrical room or dedicated enclosure cabinet. Includes incoming supply termination, earthing verification and pre-energisation checks.
KNX bus wiring
Installation of KNX TP (twisted pair) bus cable throughout the building. Correct polarity, shielding and topology per KNX installation guidelines. Line coupler cabling for multi-line systems.
DALI circuit setup
DALI-2 bus wiring from the gateway to each driver. Polarity verification, current budget check, short-circuit isolation per circuit. Emergency DALI circuit wiring per EN 50172.
Device commissioning
Physical addressing of all KNX devices via ETS6 programming interface. DALI device discovery, group assignment and scene configuration. Blind actuator calibration and binary input parameterisation.
ETS6 programming
Full on-site ETS6 programming session: download of group addresses, device parameters, time programs, heating setpoints and scene configurations. Complete as-built ETS6 project file delivered on completion.
Integration & testing
End-to-end functional testing of all scenes, schedules and integrations (Modbus, BACnet, IP cameras, audio). Each function logged in the commissioning test sheet, signed by the lead engineer.
How we work
Installation process
Site survey
We visit (or review site photos / plans remotely) to confirm cable routing, enclosure positions, junction box locations and any site-specific constraints before the main installation day.
Installation day(s)
Panel mounting, bus cable installation, DALI circuit wiring, sensor and actuator positioning. Timeline depends on project size — typical apartment: 1–2 days; villa: 3–5 days; office: 1–2 weeks.
Commissioning
ETS6 download, DALI commissioning, integration test, scene verification and time program setup. All functions verified against the commissioning checklist.
Handover training
1–2 hour session with the building operator or owner. Covers visualisation interface, scene control, energy dashboard and how to contact us for support.
Documentation
As-built documentation package: final ETS6 file, updated wiring diagram, commissioning test report, DALI configuration file and handover training notes.
Geographic coverage
Where we install
Our installation team is based in Riga, Latvia. We cover the Baltics as our home territory and take on EU projects for larger-scope installations where on-site presence is economically justified.
For projects outside the Baltics, travel and accommodation costs are included in the project quote. Remote commissioning support via KNX/IP is available for projects where physical presence is not feasible.
LatviaHome base
Riga, Jūrmala, Jēkabpils, Valmiera, Daugavpils, Liepāja, Ventspils
Home base — no travel surcharge
Estonia
Tallinn, Tartu, Pärnu, Narva, Haapsalu
Day trip or 1-night stay depending on project scope
Lithuania
Vilnius, Kaunas, Klaipeda, Šiauliai, Panevėžys
Same as Estonia — proximity allows fast response
EU projects
Germany, Netherlands, Belgium, Poland, Austria, Sweden, Denmark, Finland
Available for larger projects. Travel cost included in project quote.
Our team
Certified KNX installers
Every engineer on a PanelCraft installation is KNX Partner certified and has worked on a minimum of 20 KNX projects.
All lead engineers hold current KNX Association Partner certification. Renewal maintained annually.
Certified to perform IEC 61439-1/2 low-voltage assembly verification. Authorised to sign measurement protocols.
Trained in DALI-2 commissioning tools (Helvar, Tridonic, Osram, Osix). Emergency lighting EN 50172 compliance.
Senior installers with minimum 10 years on KNX projects ranging from single apartments to 200-room hotels.
Scheduling guide
Typical installation timelines
Times refer to site-time only — not including transit days.
Apartment (80–200 m²)
Site days
1–2 install + 1 commission
Typical scope
Single KNX line, 1 DALI circuit, 30–80 devices, video intercom
Villa (200–600 m²)
Site days
3–5 install + 2 commission
Typical scope
Multi-line KNX, 3–6 DALI circuits, 80–200 devices, gate/pool/garden
Office (500–3000 m²)
Site days
5–12 install + 3–5 commission
Typical scope
Multi-line KNX, DALI-2 presence control, Modbus HVAC, energy meters
Hotel / hospitality
Site days
Custom schedule
Typical scope
Phased room-by-room commissioning, GRMS integration, DMX facade
Book a team
Book your installation
Send us your project address, installation scope and preferred dates. We confirm availability and provide a site-visit quote within 2 working days.