A consumer-unit schedule is the document that turns a wiring design into something an installer can actually build from — every circuit, what it serves, and room to grow. Get the separation logic and reserve-way planning right, and the breaker sizing itself stays a conversation between the load calculation, the cable datasheet and a certified electrician.

Standards-based, no invented breaker ratingsHonest datasheet-and-electrician-first guidanceEU-wide project support
CAN-BUS
CAN
Consumer-unit schedule
How a circuit schedule comes together

How a circuit schedule comes together

01

Map rooms to loads

List every room and what it needs — general lighting, socket outlets, and any fixed high-power appliance such as an oven, hob, EV charger or heat pump. This is the raw input the schedule is built from.

02

Group into circuits, not just points

Lighting and socket circuits are kept separate, so a nuisance trip on one leaves the other live. High-power appliances typically get their own dedicated circuit rather than sharing a general-purpose way.

03

Draft the consumer-unit schedule

Turn the circuit groups into a formal list — one line per way, what it feeds, and which protective device serves it — plus deliberate reserve/spare ways sized for the specific project, not a generic rule of thumb.

04

Confirm ratings, then label and document

The actual breaker rating, RCD type and number of ways are set by a certified electrician against the load calculation, the cable's datasheet and applicable national wiring rules — then every circuit gets labelled and the schedule becomes as-built documentation.

Why the schedule is a separate deliverable from load-distribution principles

Why the schedule is a separate deliverable from load-distribution principles

1

document, every way accounted for

The consumer-unit schedule is a single reference document that lists each circuit, what it serves and its reserve ways — the practical companion to the underlying load-distribution engineering, not a replacement for it.

Lighting and sockets, separated on principle

Keeping lighting circuits apart from socket circuits means a fault or nuisance trip on one doesn't leave a room both dark and without power — a basic resilience decision made at the schedule stage.

Dedicated ways for high-power loads

An oven, hob, EV charger, heat pump or sauna heater is usually planned onto its own circuit sized specifically for that load, rather than folded into a general socket ring or radial.

Reserve ways are a design decision, not an afterthought

How many spare ways to leave depends on the project and the enclosure size — decided deliberately at schedule stage, because adding a way later means reopening finished walls and ceilings.

One document, updated as the installation changes

The schedule is only useful if it stays current — every circuit change during the build or later gets reflected back into the document, not left as tribal knowledge.

Ratings come from calculation, not from a schedule template

The schedule records which circuit goes where; it doesn't set the breaker amperage or RCD threshold — those numbers come from the load calculation, the cable datasheet and the electrician applying the applicable code.

Options

How panelcraft supports the planning stage

Practical input for the schedule, sized enclosures and standards-based routing

  • {'t': 'Room-to-load mapping input', 'd': 'We help structure the room/appliance list that feeds the schedule, so nothing gets missed before the circuit grouping stage.'}
  • {'t': 'Circuit separation logic', 'd': 'Guidance on the lighting/socket/high-power split and which loads typically warrant their own dedicated way, cross-referenced against the underlying circuit design and load-distribution principles.'}
  • {'t': 'Reserve-way and enclosure sizing', 'd': 'Advice on leaving enough spare ways and enclosure space for the project at hand, coordinated with comb-busbar and DIN-rail sizing so the physical layout actually fits.'}
  • {'t': 'Routing and cable-entry coordination', 'd': "Input on keeping power and low-voltage/data (KNX, UTP) runs separate and on planning cable entry into the enclosure, aligned with the panel's structural and mechanical mounting."}
  • {'t': 'A direct line before the electrician signs off', 'd': 'For anything beyond a standard layout, you reach an engineer who can sanity-check the schedule structure before it goes to the certified electrician for final ratings and sign-off.'}
FAQ

Frequently asked questions

What's the difference between this and your load-distribution-principles page?

That page covers the underlying engineering principles of how load gets distributed across circuits. This page covers the practical deliverable — the schedule document itself, listing every circuit, what it serves, and its reserve ways — that you hand to the installer.

How many circuits should our consumer unit have?

There's no universal number — it depends on the property size, the room-to-load mapping and the applicable national wiring rules. A certified electrician determines the final circuit count from your specific load calculation.

Should lighting always be on a separate circuit from sockets?

Separating them is standard good practice so a fault on one doesn't remove both light and power from a space. The exact circuit arrangement still has to be confirmed against the load calculation and applicable regulations.

How many reserve ways should we leave for future expansion?

That depends entirely on the enclosure size and the project's future plans — there's no fixed figure. It's worth deciding deliberately at the design stage, since adding capacity later is far more disruptive than leaving room for it up front.

Who decides the actual breaker and RCD ratings for each circuit?

That's always the job of a certified electrician, working from the load calculation, the cable's datasheet and the applicable national wiring rules — Latvia's Ministru kabineta noteikumi, LVS standards and the IEC 60364 series. We help structure the schedule; we don't assign ratings.

Get your circuit schedule reviewed

Send us your room-to-load list and enclosure constraints, and our engineers will help structure the circuit schedule and reserve-way planning before it goes to your certified electrician for final sign-off.

Contact our engineers
Related guides

Related guides

Loading...
Back to top